By Stuart Brown
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at Burnley
road – between Midgley road and Hebden Bridge, by Common Bank Wood – activity due 6-7pm 4thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Strains
by carrying too much equipment.
|
Cast
and crew.
|
Equipment
is mainly digital recording - camera’s
and audio.
Boom
microphone/tripods and camera track will also be used.
Equipment
will be shared via film crew and be within their lifting capability. Lift
available for movement of equipment from Mytholmroyd to location.
SB
to ensure no-one is carrying too much.
|
SB
to oversee movement of items.
|
Falling
over scene.
|
Actor
falling over.
|
Actor
will rehearse fall to reduce the risk of hurting himself.
|
Rehearse
the fall softly. Brief team before filming.
|
Vehicles
|
Cast
and crew.
|
A
team member will be responsible for looking out for the rare chance of
approaching vehicles that appear to be recklessly driven, and has the
possibility of hitting crew on pavement.
All film crew members to wear high visibility vests during filming. No
more than two crew members will stand side beside while on pavement.
|
Ensure
vests worn + watcher in place during activity.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use. Tape loose
wires down. All crew will be notified of how to hold equipment, and told how
to hold cables correctly.
|
SB
to check camera track/cables once set up is in place
|
Equipment
going missing .
|
College
resources .
|
Member
of crew – as designated watcher.
|
Vigilance
by all crew
|
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at 7
Hullett Close (Our family home) – activity
due 10-11am 5thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Strains
by carrying too much equipment.
|
Cast
and crew.
|
Equipment
is mainly digital recording - camera’s
and audio.
Boom
microphone/tripods will also be used.
Equipment
will be shared via film crew and be within their lifting capability. Lift
available for movement of equipment from Mytholmroyd station to house.
SB
to ensure no-one is carrying too much.
|
SB
to oversee movement of items.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use. Tape loose
wires down. All crew will be notified of how to hold equipment, and told how
to hold cables correctly.
|
SB
to check camera track/cables once set up is in place
|
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming on train – between Leeds and Hebden Bridge Station – activity due 4-5pm 4thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Blade
on set.
|
Cast
and crew.
|
Actor
comfortable with slight cut of finger. Blade will be new and soaked in
alcohol to sterilise it the night previous. It will also be kept in a secure
packaging and a designated person crew member will be responsible for knowing
its whereabouts at all times.
|
SB
to oversee movement of item. He is to notify CB of its whereabouts during any
change in location to ensure it is never left unattended. First Aid will be
on set.
|
Equipment
going missing .
|
College
resources .
|
Member
of crew – as designated watcher.
|
Vigilance
by all crew
|
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at Hebden
Bridge park, – activity due 7-8pm 4thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Strains
by carrying too much equipment.
|
Cast
and crew.
|
Equipment
is mainly digital recording - camera’s
and audio.
Boom
microphone/tripods and camera track will also be used.
Equipment
will be shared via film crew and be within their lifting capability. Lift
available for movement of equipment from Mytholmroyd to location.
SB
to ensure no-one is carrying too much.
|
SB
to oversee movement of items.
|
Falling
over scene.
|
Actor
falling over.
|
Actor
will rehearse fall to reduce the risk of hurting himself.
|
Rehearse
the fall softly. Brief team before filming.
|
Vehicles
|
Cast
and crew.
|
A
team member will be responsible for looking out for the rare chance of
approaching vehicles that appear to be recklessly driven, and has the
possibility of hitting crew on pavement.
All film crew members to wear high visibility vests during filming. No
more than two crew members will stand side beside while on pavement.
|
Ensure
vests worn + watcher in place during activity.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use. Tape loose
wires down. All crew will be notified of how to hold equipment, and told how
to hold cables correctly.
|
SB
to check camera track/cables once set up is in place
|
Equipment
going missing .
|
College
resources .
|
Member
of crew – as designated watcher.
|
Vigilance
by all crew
|
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at 7
Hullett Close, (Family Home) activity
due 11pm-1am 4/5thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure
appropriate behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Blade
on set.
|
Cast
and crew.
|
Actor
comfortable with risk of slight cuts. Blade will be new and soaked in alcohol
to sterilise it the night previous. It will also be kept in a secure
packaging and a designated person crew member will be responsible for knowing
its whereabouts at all times.
|
SB
to oversee movement of item. First Aid will be on set.
|
Cuts
into skin.
|
Actor.
|
Actor comfortable with risk of slight cuts.
Camera will cut away before deep cuts happen.
|
First
Aid will be on set.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use. Tape loose
wires down. All crew will be notified of how to hold equipment, and told how
to hold cables correctly.
|
SB
to check camera track/cables once set up is in place
|
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at hebden
Bridge, – activity due 8-9pm 4thth
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Strains
by carrying too much equipment.
|
Cast
and crew.
|
Equipment
is mainly digital recording - camera’s
and audio.
Boom
microphone/tripods and camera track will also be used.
Equipment
will be shared via film crew and be within their lifting capability. Lift
available for movement of equipment from Mytholmroyd to location.
SB
to ensure no-one is carrying too much. Take due care of any others persons
present in the lift/car par areas.
|
SB
to oversee movement of items.
|
Actor
gets hurt.
|
Actor
as there is a stage punch.
|
Actors
will rehearse the punch to ensure its safe.
|
Rehearse
the punch many times.
|
Crew
and Actors being hurt and police arriving.
|
Cast
and crew.
|
As
good Samaritans may presume its real, crew will be wearing high visibility
vests, and a designated watcher will lookout for approaching people to notify
them of the filming. This should also give nobody a reason to call police, is
high visibility vests are worn by all crew at all times.
|
Ensure
vests worn + watcher in place during activity.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use. Tape loose wires
down. All crew will be notified of how to hold equipment, and told how to
hold cables correctly.
|
SB
to check camera track/cables once set up is in place
|
Equipment
going missing .
|
College
resources .
|
Member
of crew – as designated watcher.
|
Vigilance
by all crew
|
Leeds College of Art - Risk
Assessment
Film project manager – Stuart
Brown - SB (student) – mobile – 07581498917 email - Stuart Brown sb102262@students.leeds-art.ac.uk
Student filming at Mytholmroyd
Station, – activity due 5:00 – 6:00pm 4th
March 2014. Method
statement attached.
Hazards
|
Who might be harmed and how?
|
Control measures
SB to record full crew/actors list + to brief crew/actors to ensure appropriate
behaviour for filming activity.
|
Further action:
Do you need to do anything else to manage this risk?
SB is the activity manager & to take charge/control as required.
|
Trains
|
Actor
could fall on tracks
|
Filming
will take place avoiding trains via the train timetable and notice board. One
team member will be responsible for looking out for any unscheduled trains
and filming will stop until train has safely passed.
|
Actor
will be being held by crew off camera, to ensure if he did loose footing, he
would not fall.
|
Trains
|
College
resources.
|
All
cameras will be held correctly with safety straps around necks and arms to
ensure if dropped; the equipment would not hit the floor or tracks.
|
SB
will ensure all equipment will be being used correctly and safely.
|
Trips
and falls
|
Any
crew member falling.
|
Notify
members when it is assembled, disassemble immediately after use.. All crew
will be notified of how to hold equipment, and told how to hold cables
correctly.
|
SB
to check camera track/cables once set up is in place
|
Equipment
going missing .
|
College
resources .
|
Member
of crew – as designated watcher.
|
Vigilance
by all crew
|
No comments:
Post a Comment