Video
Filming - 6:00pm – 8:00pm Tuesday 10th of
December 2013
Location –
Leeds College of Art Studio Theater (Green Screen Scene).
For this section
of the film, Thor and Loki battle for a maximum of 10 seconds across a lava background.
There
will be two actors (one being director also who will over-see health and safety),
a camera operator, a hair and makeup artist over seeing continuity (of the
whole project), a sound recorder, and documenter. In total 6 people will be
present. All members will help carrying
equipment up the moor and I will personally see that no one person carries too
much (for the safety of the person and equipment.)
Due to
the nature of the film, the two actors will wear leather costumes which will provide
protection from small grazes if unforeseen accidents happen (such as tripping
over a cape or getting hurt in a choreographed fight scene) but no safety
equipment will be required.
Equipment
- 1 x 5D camera
-
1 x Boom
mike, and extension with Recoder
-
1 x Tripod
-
1 x Green
Screen
-
1 x Make
up powder and concealer
-
6 x
Superglue tubes (to fix costumes and props if they break)
-
2 x Costumes
(leather boots, coat, vest, cape, 4 x shin pads, wig, trousers)
-
2 x Contact
lenses
-
2 x
Lights
-
1 x Hairspray
-
1 x Hair gel
-
1x Pack
of plasters (if actors are grazed.)
-
2 x Spray
paints (to fix costumes and props if they break)
-
Plastic
hammer
- Plastic Sceptor (staff)
What will
be done on location:
1. Green Screen set up.
2.
Lights
are assembled in correct place.
3.
Tripod
set up so frame is within green screen.
4.
Actors go
over the previously choreographed fight, ensuring it is all within green screen
framing.
5. Scene is filmed.
6. Equipment packed away (lights
last as they need to cool down).
7.
Team
departs.
No comments:
Post a Comment