Filming - Stoodley Pike
9:00am – 12:00pm and Bride Stone rocks 1:00pm – 4:00pm Thursday 12th
of December 2013.
Location –
Stoodley Pike and the Bride Stone Rocks, Todmorden moors.
For this section
of the film, firstly Thor confronts Loki and after short dialogue, they begin
to fight. The second scene is the final scene where they battle, and Thor
defeats Loki.
There
will be two actors (one being director also who will over-see health and safety),
a camera operator, a hair and makeup artist over seeing continuity, a sound
recorder, an runner and documenter. In total 7 people will be present. All members will help carrying equipment up
the moor and I will personally see that no one person carries too much (for the
safety of the person and equipment.)
Due to
the nature of the film, the two actors will wear leather costumes which will
provide protection from small grazes if unforeseen accidents happen (such as
tripping over a cape and falling during chorographer fight scenes) but no
safety equipment will be required. One team member will also be looking out for
tourists to ensure no one thinks two people are actually fighting.
Because
we are filming on moors, if the wind is too high and fast, the crane will not
be used, and the fight sequence will not take place near the edge of the rocks.
No
lightening will be present as the area is outside. All electrical equipment
will be battery powered and no generators will be on site.
No smoking
or alcohol of any kind will be permitted.
Equipment
- 1 x 5D camera
-
1 x Boom
mike, Muffler and extension with Recoder
-
2 x Tripod
-
1 x Crane
-
1 x Make
up powder and concealer
-
6 x
Superglue tubes (to fix costumes and props if they break)
-
2 x Costumes
(leather boots, coat, vest, cape, 4 x shin pads, wig, trousers)
-
2 x Contact
lenses
-
1 x Hairspray
-
1 x Hair gel
-
1x Pack
of plasters (if actors are grazed.)
-
2 x Spray
paints (to fix costumes and props if they break)
-
Plastic
hammer
- Plastic Sceptor (staff)
What will
be done on location:
1. 4 members are driven to Hebden
Bridge Station, other 3 get the train there. (Being driven saves the team from
carrying it to the station).
2.
Meet
there and 8:00, and once the 2nd car arrives all drive to 1st
location, walk up moor to exact location.
3. Arrive there for 9:00.
4. Equipment is unloaded and checked
that all is present.
5.
Equipment
will be assembled in stages so that it is not left
unattended.
6. Team will begin shooting.
7.
Crane is
set up.
8.
Crane
shot is filmed and packed away.
9.
Other
shots then filmed. Have back up if Crane cannot be used.
10. A member
of the team will ensure location is left as it was found (all equipment is
gathered and rubbish is disposed of).
11. Team
leaves at 12:00.
12. Cars pick
team up with lunch, quick stop at my house for lunch, tea and toilet breaks.
13. Travel to
next location for 1:00, walk 15 minutes to exact location on the moor.
14. Set up
Crane and shoot that scene.
15. Pack
away, and shoot rest of storyboards.
16. A member
of the team will ensure location is left as it was found (all equipment is
gathered and rubbish is disposed of).
17. Team
leaves.