Thursday 9 January 2014

Shoot 3 + 4 Method Statement


Method Statement

Video Filming - Stoodley Pike 9:00am – 12:00pm and Bride Stone rocks 1:00pm – 4:00pm Thursday 12th of December 2013.

Location – Stoodley Pike and the Bride Stone Rocks, Todmorden moors.

For this section of the film, firstly Thor confronts Loki and after short dialogue, they begin to fight. The second scene is the final scene where they battle, and Thor defeats Loki.

There will be two actors (one being director also who will over-see health and safety), a camera operator, a hair and makeup artist over seeing continuity, a sound recorder, an runner and documenter. In total 7 people will be present.  All members will help carrying equipment up the moor and I will personally see that no one person carries too much (for the safety of the person and equipment.)

Due to the nature of the film, the two actors will wear leather costumes which will provide protection from small grazes if unforeseen accidents happen (such as tripping over a cape and falling during chorographer fight scenes) but no safety equipment will be required. One team member will also be looking out for tourists to ensure no one thinks two people are actually fighting.

Because we are filming on moors, if the wind is too high and fast, the crane will not be used, and the fight sequence will not take place near the edge of the rocks.

No lightening will be present as the area is outside. All electrical equipment will be battery powered and no generators will be on site.

No smoking or alcohol of any kind will be permitted.

Equipment

-       1 x 5D camera
-       1 x Boom mike, Muffler and extension with Recoder
-       2 x Tripod
-       1 x Crane
-       1 x Make up powder and concealer
-       6 x Superglue tubes (to fix costumes and props if they break)
-       2 x Costumes (leather boots, coat, vest, cape, 4 x shin pads, wig, trousers)
-       2 x Contact lenses
-       1 x Hairspray
-       1 x Hair gel
-       1x Pack of plasters (if actors are grazed.)
-       2 x Spray paints (to fix costumes and props if they break)
-       Plastic hammer
-       Plastic Sceptor (staff)


What will be done on location:

1.      4 members are driven to Hebden Bridge Station, other 3 get the train there. (Being driven saves the team from carrying it to the station).

2.      Meet there and 8:00, and once the 2nd car arrives all drive to 1st location, walk up moor to exact location.

3.      Arrive there for 9:00.

4.      Equipment is unloaded and checked that all is present.

5.      Equipment will be assembled in stages so that it is not left
unattended.

6.      Team will begin shooting.

7.      Crane is set up.

8.      Crane shot is filmed and packed away.

9.      Other shots then filmed. Have back up if Crane cannot be used.

10.  A member of the team will ensure location is left as it was found (all equipment is gathered and rubbish is disposed of).

11.  Team leaves at 12:00.

12.  Cars pick team up with lunch, quick stop at my house for lunch, tea and toilet breaks.

13.  Travel to next location for 1:00, walk 15 minutes to exact location on the moor.

14.  Set up Crane and shoot that scene.

15.  Pack away, and shoot rest of storyboards.

16.  A member of the team will ensure location is left as it was found (all equipment is gathered and rubbish is disposed of).

17.  Team leaves.